Projects & typical scope

Below are examples of typical project scopes in two areas: UV disinfection systems (operator support) and PLC-based building automation. Client names and site details are intentionally kept neutral.

UV Disinfection Systems (Operator Support)

Focus: support with commissioning, troubleshooting, optimization and technical evaluation – especially in challenging situations (e.g. performance deviations, interface issues, lamp/ballast topics).

Commissioning / Re-Commissioning

Target: Operators (A)

  • Commissioning checklists, functional tests, parameter setup
  • Signal verification and plausibility checks
  • Handover protocols and structured documentation

Troubleshooting & Performance Optimization

Target: Operators (A)

  • Analysis of performance drops / unstable operation
  • Evaluation of operational data (trends/logs) and electrical measurements
  • Optimization of operating parameters and action plan

Premature Lamp Failure Analysis

Target: Operators / critical cases (C)

  • Root cause analysis (operation, switching cycles, temperature, ballasts)
  • Comparison of expected vs. actual lifetime, technical assessment
  • Recommendations for stabilization and evidence-based documentation

Interface & Communication Issues

Target: Operators / critical cases (C)

  • Diagnostics of fieldbus/network topics (e.g. Profinet/Modbus)
  • Review of PLC/HMI logic and signal paths
  • Clear findings and documented recommendations

Building Automation (PLC)

Focus: robust PLC architectures, integration of existing systems and SCADA/BMS connectivity – for operators (A) and as project support for integrators/EPCs (B).

PLC Automation for Buildings

Target: Operators (A)

  • HVAC control, shading, room automation
  • Energy optimization & load management
  • Web HMI, logging & trending

Integration of Existing HMI / Controllers

Target: Operators & Integrators (A/B)

  • Integrating existing controllers into PLC architectures
  • Interfaces: Profibus, Profinet, Modbus (RTU/TCP)
  • Stepwise retrofit with minimal downtime

SCADA / BMS Integration

Target: Operators & Integrators (A/B)

  • Data point mapping, alarms and trending
  • Handover to SCADA/BMS incl. logging
  • Structured commissioning and handover documentation

Custom Solutions & Modernization

Target: Operators (A)

  • Extensions, special functions, retrofit for existing sites
  • New visualization, data logging, energy monitoring
  • Clear system architecture and documentation